Projects

Mountain View Medical Center

Owner: Drs. Pierre & Katherine Johnson

Location: Fairbanks, AK

What we did: Constructed a two story medical complex with multiple medical clinical buildouts on the 1st floor, and several TI spaces on the 2nd floor. Full civil, structural, architectural and MEP packages, designed and built by G2 Construction in conjunction with our design team on the project. 1st floor, Eye Clinic, eyeglass shop, internal medicine. 2nd floor has had multiple buildouts and TI projects since being built that G2 has performed as well.

Recently redeveloped the 2nd floor and part of the 1st floor into a VA Clinic, as part of our continued support of VA projects throughout the northwest United States.

When was it: Started and completed in 2012
Overall cost: 4 million
Original build cost: 2.5 million

VAMC Clinic cost: 1.5 million

EHRM (Electronic Health Records Management) Rollout, VA

Owner: Department of Veterans Affairs

Locations: Anchorage and Spokane VA campuses

What we did: Various projects to assist with rollout of the Spokane and Anchorage EHRM mandates pertaining to electronic health records management requirements for the new Cerner management system. This required substantial upgrades to existing comm, power, and mechanical infrastructure across both campuses. Redid fiberoptic and copper comm throughout campuses, new power and backup power as required, new HVAC to support OIT infrastructure, reworked comm closets throughout both campuses. Also executed multiple architectural scopes.

When was it: Started doing EHRM design build projects for the Spokane VA in 2019, last EHRM project slated to end December 2022.

Overall cost: 21.5 Million so far

  • Spokane – Acq 2 & 3 – 9 Million
  • Spokane – Acq 1 & 4 – 8 Million
  • Anchorage – EHRM Upgrades – 1.5 Million
  • Upgrades – 1.5 Million
  • Spokane – Upgrade IT Server Room – 2.6 Million
  • Server Room – 2.6 Million

Raven’s Landing Senior Community

Owner: Retirement Community of Fairbanks, Inc.

Location: Fairbanks, AK

What we did: Built phases two through four of Raven’s Landing housing, capped by construction of community center in final phase.

When was it: Raven’s Landing Phase 2 built in 2012. Final phase built in 2016.

Overall cost: $15 million overall scope

G2 Construction is the leader in design, logistics and construction.

Ryan Middle School, Fairbanks, AK

Owner: Fairbanks North Star Borough

Location: Fairbanks, AK

What we did: Built a 60,000 square foot 2 to 3 story addition to an existing middle school in Fairbanks, AK, structure based on red iron and fire treated framing. Accompanied by significant hazmat demolition (old main school), ~16 acres of civil work, intertie and expansion of existing school systems, full MEP package, safety/security package, fire protection, playground equipment and track & field equipment.

When was it: Started in April 2015, substantial completion on the structure and open for next school year. Final civil completion September of 2016.

Overall cost: 30 Million

Staybridge Inn & Suites

Owner: IHG Hotels
Location: Anchorage, AK

What we did: Ground up construction of 125 room 4 story hotel in midtown Anchorage. Complete new build with full site civil and structural build. High grade architectural finishes, full MEP package, pool/hot tub, outdoor recreation areas, and furniture install. All completed in a high-seismic zone, which required a high degree drawing and field coordination to ensure build completion.

When was it: 2016 – 2018

Overall cost: 21 Million